Comprehensive Carpentry Services
  • Home
  • About Us
  • Services
  • Projects
  • Project Gallery
  • Health & Safety
  • Environmental
  • Contact Us
  • More
    • Home
    • About Us
    • Services
    • Projects
    • Project Gallery
    • Health & Safety
    • Environmental
    • Contact Us
Comprehensive Carpentry Services
  • Home
  • About Us
  • Services
  • Projects
  • Project Gallery
  • Health & Safety
  • Environmental
  • Contact Us

Projects

Kibrooke Phase 2 - Durkan Ltd

 Kidbrooke Phase 2 consists of the construction of 2 blocks of apartments and 40+ townhouses, all designed to achieve a code for sustainable homes level 3. 

CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.


Project duration: 12 months

CCS Package Value: £3.6 million

Southmere Village Phase 1B – Thamesmead - Durkan

 Durkan Ltd won a £126m contract with Peabody to design and build 404 new homes. 

CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.


Project duration: 18 months

CCS Package Value: £3.3 million

The Royal Military Academy - Woolwhich - Durkans

 Durkans Ltd won a £70m contract to construct a mixture of 180 new build and refurbishments of grade 1 listed army barracks into apartments and houses.

CCS was contracted to undertake all 1st fix structural works and 2nd fix works with certified fire door installation.


Project Duration: 24 months

CCS Package Value: £2.9 million

Princess Royal University Hospital - Orpington - Vinci Facilities

 VINCI Facilities has provided various facilities management and building solutions at the Princess Royal University Hospital (PRUH). 

  CCS was contracted for the removal of all existing fire doors, and the supply and install of new fire doors in a live hospital.


Project Duration: 12 months

CCS Package Value: £2.7 million

Ark Soane Academy school and Residential – Acton town – Jerram Falkus

 Jerram Falkus won a £52m contract for Countryside and the Department for Education to design and build a 50-classroom school over 3 levels, with a further 116 apartments in 4 blocks.

CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.


Project duration: 12 months

CCS Package Value: £1.969 million

Southmere Village Phase 1A – Thamesmead – Durkan

Durkan Ltd won a £45m contract with Peabody to design and build 130 new homes. 

CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.


Project duration: 12 months

CCS Package Value: £1.9 million

Trent Park – Berkeley Homes

 Trent Park is a residential development by Berkeley in Enfield, London EN4.  Comprising 270 traditionally designed two, three, four and five-bedroom homes within 56 acres of historic grounds in Enfield.

CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.


Project duration: 2 years

CCS Package Value: £1.8 million

The Britannia Music Site - Ilford - Durkan

Durkan Ltd won a £100m contract to construct 354 flats across 4 blocks. 

CCS  was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.


Project duration: 18 months

CCS Package Value: £1.7 million

Royal College Of Arts – Battersea – Kier

Kier London won a £56m contract to construct a new state-of-the-art academic studio and research building located in Battersea.

CCS was contracted to undertake 1st and 2nd fix carpentry works with certified fire door installation. 


Project Duration: 8 months 

CCS package Value: £1.2 million

Kibrooke Phase 1 - Durkan Ltd

 Durkan won the contract with Berkeley Homes for Kidbrooke Phase 1 -   A new development consisting of the largest development of council homes in the Royal Borough of Greenwich, creating 450 homes.

CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.


Project duration: 12 months

CCS Package Value: £1.1 million

Manor and Braganza - Durkan

  Manor & Braganza by Durkan Homes, in partnership with Southwark Council, is a collection of townhouses and apartments in Kennington.  

CCS was contracted to undertake 1st and 2nd fix carpentry works with certified fire door installation.


Project duration: 12 months

CCS Package Value: £1.1 million

Roxwell Road - Barking - Jerram Falkus

Jerram Falkus won a £26.7m contract with Be First/London Borough of Barking and Dagenham for Roxwell road - a contemporary residential development which will feature 87 new homes, including 80 flats across four blocks and seven townhouses.

CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.


Project duration: 10 months

CCS Package Value: £1 million

Wixams Village - Bedford - Galiford Try

Galiford Try Ltd won a £60m contract to construct a retirement village of 210 apartments across 6 blocks. 

CCS was contracted to undertake all structural carpentry works.


Project Duration: 12 months

CCS Package Value: £855,000

Higgs Estate - Durkan

Durkan Ltd won a £85m contract with Peabody to redevelop an industrial site into 134 high-quality new homes and 45,000 square feet of commercial space. 

CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.


Project duration: 12 months

CCS Package Value: £700,000


Grand Union SEND school – Greenford – ISG

ISG secured a further £48 million of framework wins with the Department for Education.  The Grand Union School is an 80-place primary school for pupils with special educational needs and disabilities (SEND).  

CCS was contracted to undertake 1st and 2nd fix carpentry works with certified fire door installation.


Project duration: 12 months

CCS Package Value: £615,000


Hollesley Bay Prison – Hollesley – Vinci Building Solutions

 Vinci Building Solutions won contract to replace and upgrade the fire doors throughout the prison.

  CCS was contracted to undertake certified fire door install.


Project Duration: 6 months

CCS Package Value: £500,000

St Clements House - Rochester - Jerram Falkus

  Jerram Falkus won a £12.3m contract with MHS homes for the design and construction of a reinforced concrete 5 and 6 storey building, providing 44 new independent apartments in Rochester.    

  CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.


Project Duration: 4 months

CCS Package Value: £450,000

Southmere Village Library – Thamesmead - Durkan

 Durkan Ltd won an £8m contract with Peabody to design and build a library. 

CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.


Project duration: 4 months

CCS Package Value: £420,000

Hyde Park Barracks – Knightsbridge – Vinci

  Vinci Facilities won a £423m contract to provide facilities management services for the United Kingdom Ministry of Defence.  

CCS was contracted to undertake 2nd fix carpentry works with certified fire door installation for Hyde Park Barracks.

Burridge & Heath, our sister company, manufactured all 450 door sets to bespoke specifications.


Project duration: 8 months

CCS Package Value: £387,000


Italian Hospital – Great Ormand street – Kier London

 Kier won £25m contract to refurbish the Italian hospital into a new Sight and Sound Centre within a grade II listed building.

  CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door install.


Project Duration: 6 months

CCS Package Value: £344,000

The Launchpad – Southend – Morgan Sindall

 Morgan Sindall won £8m contract to construct a three story home for innovation in Southend-on-Sea.

  CCS was contracted to undertake first and 2nd fix carpentry and joinery package with certified fire door install.


Project Duration: 4 months

CCS Package Value: £216,500

The Maria Fidelis School - Camden - Kier

Kier London won a £26m contract to build a new state of the art secondary school for Camden council. 

CCS was contracted to undertake all 1st and 2nd fix carpentry works with certified fire door installation. 


Project Duration: 28 weeks 

CCS package Value: £190,000


Addington Valley Academy – Addington – Kier London

Kier won a £13.6m contract to construct a special educational needs (SEN) school in New Addington.

  CCS was contracted to undertake first and 2nd fix carpentry and joinery package with certified fire door install.


Project Duration: 4 months

CCS Package Value: £136,000

Thayer Street - Marylebone - Knight Harwood

Knight Harwood won a contract with The Howard de Walden Estate to construct a new steel frame building, to create retail space and offices over six storeys totalling 28,000 sq ft. 

 

CCS was contracted to undertake 1st fix mansard roof structure works.


Project duration: 4 months

CCS Package Value: £120,000


Hilton West End – Holborn – Fileturn

 Fileturn won £12.2m contract to undertake a large redevelopment project for this DoubleTree hotel, creating 74 additional bedrooms.  

CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door install.


Project Duration: 9 months

Package Value: £425,000

Frederick's Place – City of London - Knight Harwood

 Knight Harwood won a contract for the construction of the seven-storey building with Cat A office spaces on the upper floors and retail provision on the lower two floors. 

CCS was contracted to undertake 1st fix mansard roof structure works.


Project duration: 3 months

CCS Package Value: £250,000

The Woolwich Polytechnic School for Girls - Thamesmead - Kier

Kier won a £32m contract  to construct a new school for girls in  Thamesmead , the schools is expected to house 2500 new students across 4 blocks and 3 levels. 

CCS was contracted to undertake all 1st and 2nd fix carpentry including certified fire door install.


Project Duration: 35 weeks 

Package Value: £245,000

The Grove School for Autism - Haringey - Kier

Kier London won a £8m contract to undertake all refurbishment works to turn a run down school into a purpose built school for student's with autism in Haringey. 

CCS was contracted to undertake all 1st and 2nd fix carpentry works including certified fire door install. 


Project Duration: 20 weeks

Package Value: £130,000

Chatten Free School – Witham - ISG Construction

  ISG Construction won a 5m contract to construct a new build SEND school in Witham, Essex.

  CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door install.


Project Duration: 4 months

CCS Package Value: £115,000

Eversley Leisure Centre – Benfleet – Morgan Sindall

 Basildon Council appointed Morgan Sindall Construction to deliver an 864 sq ft extension to the Basildon-based leisure centre, including a swimming pool extension.  

CCS was contracted to undertake 1st and 2nd fix carpentry works with certified fire door installation.


Project duration: 5 months

CCS Package Value: £113,000

Lambeth Palace – Waterloo – Knight Harwood

Knight Harwood won contract to construct a nine-storey building to house the Library and Archive of the Church of England.  

CCS was contracted to undertake 1st fix structural carpentry.


Project Duration: 3 months

Package Value: £110,000

Institute of Civil Engineers HQ – Westminster – Vinci

Vinci Facilities won a £3.396m contract to deliver a specialist refurbishment and modernisation project to the prestigious Grade II listed building within the heart of London, serving the public and construction professionals within the civil engineering industry. 


CCS was contracted to undertake 1st and 2nd fix carpentry and joinery package with certified fire door installation.   

Burridge & Heath, our sister company, manufactured all door sets on the project to bespoke specifications along with bespoke oak glazing bars for the refurbishment to the listed main dome.


Project duration: 2 months

CCS Package Value: £60,000

Foley Street - Fitzrovia - Kier

Kier London won a £17m contract to undertake all refurbishment works to a block of 7 floors of commercial units. 

CCS was contracted to undertake all 1st and 2nd fix carpentry works with certified fire door installation. 


Project Duration: 25 weeks

CCS Package Value: £348,000

Ealing Hospital - Ealing - Kier


Kier London won a £43m contract to undertake all refurbishment works to the existing Medway Lodge building. Turning a run down building in to into a fit for purpose mental health institute.

 CCS was contracted to undertake all 1st and 2nd fix carpentry with certified fire door installation.


Project Duration: 45 weeks 

CCS Package Value: £350,000


Ilford Boys school - Ilford - Kier

Kier London won a £16m contract to construct a new extension to the Ilford boys school to take more pupils. 

CCS was contracted to undertake all first and 2nd fix carpentry and joinery works with fire door installation. 


Project Duration: 24 weeks

CCS Package Value; £100,000

Belmarsh Prison - Thamesmead - Interserve

Interserve Construction won £110m contract to design and construct a new prison within the Belmarsh prison campus in Woolwich, East London.
 CCS was contracted to undertake the fitting of the cell furniture and FFE.
 

Project Duration: 65 weeks

CCS Package Value: £520,000

Cookham Wood Youth Offenders Justice Board - Rochester - Interserve

Interserve Construction won £20m contract. The project comprises the construction of a new build Young Offenders' Institution comprising a 180-person Housing Block and an Education Block. The project is located adjacent to the existing Cookham Wood prison.


 CCS was contracted to undertake the internal joinery including timber doorsets, timber glazed screens, ironmongery, bespoke joinery, IPS systems, fitting of cell furniture and FFE.
 

Project Duration: 52 weeks
CCS Package Value: £700,000

Harmondsworth Immigration Return centre - Heathrow - Interserve

Interserve Construction won £27m contract to design and construct an extension to the existing Immigration Return Centre.
 CCS was contracted to undertake the internal joinery including timber doorsets, timber glazed screens, ironmongery, bespoke joinery, IPS systems, fitting of cell furniture and FFE.
 

Project Duration: 35 weeks
CCS Package Value: £225,000

Brook House Immigration Return Centre - Gatwick - Interserve

Interserve Construction won £46m contract to design and construct a new Immigration Return Centre within the grounds of Gatwick Airport.
 CCS was contracted to undertake the internal joinery including timber doorsets, timber glazed screens, ironmongery, bespoke joinery and IPS systems.
 

Project Duration: 32 weeks
CCS Package Value: £280,000

RAF Brize Norton 47AD - Oxfordshire - Interserve

Interserve Construction won £21.6m contract to construct and design a new air despatch facility for 47 Air Despatch, Royal Logistics Corps, at RAF Brize Norton.
CCS was contracted to undertake the internal joinery including timber doorsets, timber glazed screens, ironmongery, bespoke joinery, IPS systems and FFE.

Project Duration: 20 weeks
CCS Package Value: £180,000

RAF Brize Norton South Side Housing - Oxfordshire - Interserve

 Interserve Construction won £18m contract to construct and design 42no. new houses within the grounds of the RAF base, comprising of 9no. 4 bedroom detached properties and 33no. semi-detached properties.
 CCS was contracted to undertake the structural joinery and internal joinery including, joisting, trussed roofs, stairs, timber doorsets, ironmongery and kitchens.
 

Project Duration: 32 weeks
CCS Package Value: £460,000

RAF Holton - Aylesbury - Interserve

Interserve Construction won £6m contract to refurbish 96no. bedrooms and communal washrooms.
 CCS was contracted to undertake the internal joinery including timber doorsets, ironmongery, bespoke joinery, IPS systems and FFE.
 

Project Duration: 25 weeks

CCS Package Value: £160,000


Shorncliffe Barracks Refurbishment - Cheriton - Interserve

 Interserve Construction won £8m contract to refurbish 106no. bedrooms and extension to sergeants mess.
 CCS was contracted to undertake the structural joinery and internal joinery including, roof trusses, joists, timber doorsets, ironmongery and kitchens.
 

Project Duration: 35 weeks
CCS Package Value: £320,000

Duke of York Military School - Dover - Interserve

 Interserve Construction won £12m contract to refurbish 76no. dorms, shower blocks and construct a new six form house block.
 CCS was contracted to undertake the structural joinery and internal joinery including, roof trusses, joists, cladding, timber doorsets, ironmongery and kitchens.

Project Duration: 52 weeks
CCS Package Value: £420,000

Golf Links Estate - Southall - Durkans

Durkans ltd won £19m contract to design and build a combination of 80 apartments and houses.

CCS was contracted to undertake all 1st and 2nd fix carpentry works with certified fire door installation.


Project Duration: 45 weeks 

CCS Package Value:  £357,000



New Barnet Mews - Barnet - Durkan

Durkan ltd won £7m contract to construct 31no. new properties
 CCS was contracted to undertake the structural joinery and internal joinery including, joists, glazed screens, timber doorsets, ironmongery and kitchens.
 

Project Duration: 35 weeks
CCS Package Value: £220,000

Lee Tunnel - Beckton - Morgan Sindall

 Morgan Sindall won £422m contract from Thames Water, which stretches for seven kilometres 90 metres below London and features some of the deepest shafts in Europe. Built as part of the MVB joint venture, the tunnel will improve water quality in the River Lee by intercepting a combined sewer overflow at Abbey Mills Pumping Station, Stratford.


 CCS was contracted to undertake the structural joinery and internal joinery including, joists, glazed screens, timber doorsets, ironmongery and kitchens.
 

Project Duration: 60 weeks
CCS Package Value: £600,000 

The Lanesborough Spa - Belgravia - Knight Harwood

Knight Harwood won the contract to build a new spa within the basement of the current hotel building. 

CCS was contracted to undertake certified fire door installation and IPS ducting. 


Project duration: 5 weeks

CCS Project Value: £45,000

Peckham Art Gallery - Peckham - Lengards

Lengards won the contract to undertake all refurbishment works to an existing fire station and change into a modern art gallery.

CCS was contracted to undertake all 1st and 2nd fix carpentry works.


Project Duration: 30 weeks

CCS package Value:  £97,000

Fulham Community Centre - Fulham - Lengard

Lengard won £5m contract to construct a new community centre.
CCS was contracted to undertake the structural joinery and internal joinery including, roof trusses, joists, cladding, timber doorsets, ironmongery and kitchens.

Project duration: 18 weeks
CCS Package value: £120,000

St Micheals CEP School - Wandsworth - Lengard

Lengard won £12m contract to construct an extension to the existing school and refurbish the school hall.
 CCS was contracted to undertake the structural joinery and internal joinery including, roof trusses, joists, glazed screens, timber doorsets, ironmongery and kitchens.

 Project duration: 34 weeks
 Package value: £280,000

 

Beatrix Potter School - Wandsworth - Lengard

Lengard won £7m contract to construct an extension to the existing school phase 2.
CCS was contracted to undertake the structural joinery and internal joinery including, roof trusses, joists, glazed screens, timber doorsets, ironmongery and kitchens.

 Project duration: 24 weeks
 CCS Package value: £180,000

Heathfield school - Twickenham - Lengard

Lengard won £16m contract to construct an extension to the existing school.
 CCS was contracted to undertake the structural joinery and internal joinery including, roof trusses, joists, glazed screens, timber doorsets, ironmongery and kitchens.
 

Project duration: 40 weeks
CCS Package value: £380,000

Slide Green Community centre - Erith - Lengard

 Lengard won £6m contract to construct a new-build community centre.
 CCS was contracted to undertake the structural joinery and internal joinery including, joists, glazed screens, timber doorsets, ironmongery and kitchens.
 

Project duration: 16 weeks

CCS Package value: £80,000

Copyright © 2018 Comprehensive Carpentry Services - All Rights Reserved.

  • About Us
  • Services
  • Projects
  • Health & Safety
  • Environmental
  • Contact Us

Powered by